Silver Lake Monitoring & Treatment
Annual monitoring results and treatment history for invasive aquatic species — curly-leaf pondweed, Eurasian watermilfoil, and hybrid watermilfoil.
2026
2024
Fluridone concentration was measured on April 2nd, 2024, and based on the water temperature and weather conditions, and residual concentration post-winter, a second bump treatment was carried out on April 6th, 2024.
After the second bump treatment and fluridone concentration measurement in late April, it was decided a quick survey of plant growth would be useful for determining if another bump treatment would be necessary to support the treatment’s effectiveness. On Friday May 3rd, Paul Kaari (Lake Improvement Consulting), Keegan Lund (SePRO), Amber White (SLIA), and April Londo (MNDNR) conducted a short plant survey to look at growth of Eurasian/Hybrid watermilfoil and Curly-Leaf Pondweed. During this survey trip, they saw enough surviving plant material and some new growth of Eurasian/hybrid watermilfoil to warrant a third bump treatment, which was conducted on May 8th, 2024.
2023
An initial fluridonetreatment took place on October 2nd, 2023, and was applied directly to the waterbody using underwater application. Following initial Fluridone application, water samples were collected to monitor Fluridone concentration to ensure a sufficient concentration for treatment to be successful. Water samples were collected at two different locations in the waterbody: near the public beach and near the boat launch. Water samples taken approximately 5 days after application showed a successful treatment that dosed the lake within the targeted 2-4 part per billion (ppb) range, with an average lake wide concentration of 2.85 ppb.
Water samples were collected at 14 days and 28 days post-initial fluridone application, and determined an additional, smaller application of fluridone was needed to maintain lake-wide concentrations. This “bump” treatment occurred on November 3rd, 2023, which included another water sample and concentration measurement on November 10th to ensure sufficient concentration for winter.
2021
2019
2018
2017
2016
2015
In May, the major bay areas of the lake were treated for invasive Eurasian watermilfoil. Lake Improvement Consulting served as the treatment contractor.
How will I know when the lake is treated? Bright orange posting notification signs will be placed on the shoreline, and buoys in the treatment areas. The primary restriction is for using the water for drinking purposes — no swimming restrictions per label specifications.
2014
2013
2012
Treatment Consultant
SLIA works with a licensed consultant for all lake treatments.
Lake Improvement Consulting LLC ↗Treatment FAQ
Individual Applications
Property owners may apply for individual shoreline treatments using the DNR permit form.
DNR Permit Form ↗Treatment FAQ
How will I know when the lake is treated?
Bright orange posting notification signs will be placed on the shoreline, and buoys will be placed in areas being treated. Homeowners/associations are responsible for removing the signs by the take-down date specified on the orange posting.
How long should people and pets stay out of treated areas?
According to label specifications, there are no swimming restrictions. However, the DNR prefers a one-day restriction on swimming and fishing activities. The primary restriction is for using the water for drinking purposes. Orange signs will list the exact product label restrictions.
Are there restrictions in untreated areas?
There are no restrictions for untreated areas of the lake.
Is the beach safe?
Restrictions apply only to designated treated areas. The beach is typically not included in treatment areas, though treatment may occur nearby.